Address:
61120 Buchanan St.
Thermal, CA 92274
Construction Budget:
Project Square Footage:
4,267 SF
Funding Source:
Measure B
Construction Start:
Summer 2016
Targeted Completion:
Fall 2016
Bond Management:
MAAS Companies
Construction Manager:
Design Professional:
HMC Architects
Project Update:
The Mecca/Thermal Campus Expansion includes 1 Interdisciplinary Lab with a Lab Prep Room and 2 general use classrooms. A new maintenance vehicle enclosure and re-design of the existing detention basin are also included with the expansion.